Office Relocation Checklist: What to Sort Before the Removal Crew Arrives

An office relocation checklist from a Devon removals firm: sort the IT, keys and parking first so your business is trading again the next morning.


By Sigma Removals · · 8 min read

A good office relocation checklist is mostly about the things that happen before the removal crew arrives: the IT, the keys and the parking. Get those three sorted and the lifting is the easy bit. Leave them to the last minute and even a short move across town can stop your business trading for days.

We’ve helped over 1,000 families and businesses move in the past five years, and when an office move goes wrong, it’s rarely because a desk was too heavy. It’s because nobody could get into the new building at 8am, the van had nowhere to park, or the phones went dead and nobody knew who to call. So this checklist starts where the real problems start.

Why office moves go wrong (and it isn’t the lifting)

Carrying desks, chairs and filing cabinets down the stairs is our job, and it’s the part you can safely hand over. What we can’t do for you is the stuff only your business can sort: who has the keys, who talks to your IT supplier, and who has told the landlord at the new place that a lorry is turning up.

Here’s the honest version of how to plan an office move: work backwards from the morning after. Picture your team walking in on day one. What do they need to be working by ten o’clock? Logins, phones, internet, a desk, the printer, the kettle. Everything on this list is there to make that morning happen.

As soon as you have a date

Pick one person to run the move. Not a committee. One name, with a mobile number, who can make decisions on the day. That’s who our crew will ask when a question comes up, and it saves a lot of “I’ll just check with someone.”

Read your lease, both of them. Check what the old lease says about the state you leave the unit in, and when you hand back the keys. Check when you actually get access to the new one. If there’s a gap between the two, you’ll need somewhere to keep things in between. We can arrange storage through our partner facilities, which are clean, dry, secure and covered by 24/7 CCTV, so a gap in dates doesn’t have to mean a gap in trading.

Book your IT supplier now. This is the one we’d underline twice. Broadband and phone line moves are often the slowest thing on the whole list, and they’re completely out of your hands once they’re booked. Ask your supplier what they need from you, and when.

Get a removals quote and a visit. It’s much easier to plan properly when someone has seen both buildings. On a move across town in Totnes, we came back more than once before the day to help the customer plan it. That’s normal for us, and it’s how you avoid surprises. Items left off the survey lead to surprises on moving day, and surprises always cost more. Our office relocations service starts with exactly that kind of look round.

Sort the IT before anything else

If one thing on this office relocation checklist decides whether you’re trading the next morning, it’s this.

  • Make a list of every device. Computers, screens, docking stations, printers, routers, phones, any server or network box in a cupboard. Write down where each one is going.
  • Back up before the move. Ask whoever looks after your systems to confirm the backup has worked, not just that it ran.
  • Decide who unplugs and who plugs in. Our crew will carry it, wrap it and put it on the right desk. Your IT person or supplier should be the one to disconnect it and set it up again.
  • Label every cable. A bag of loose leads is a long afternoon. Bag the cables for each desk together and tape the bag to the screen.
  • Check the new building’s sockets and network points against your floor plan before the day, not on it.

Keys, alarms and access

This is the most common reason a move starts late. Before the day, make sure you know:

  • Who is holding the keys for both buildings, and what time they’ll be there.
  • The alarm codes, and who to ring if the alarm goes off anyway.
  • Whether there’s a lift, and whether it can be booked or held.
  • Whether you share a loading area or entrance with other tenants, and if they’ve been told.
  • Any fobs, swipe cards or gate codes the crew will need to get in and out.

Give all of this to the one person running the move, and have them send it to us in one message.

Parking: the Devon problem

This is where a local firm earns its keep. We know the narrow Devon lanes that connect villages, the seasonal traffic on coastal routes, and the parking challenges in historic town centres. An office above a shop in a busy high street is a very different job from a unit on a business park with its own yard.

Our fleet runs from small vans up to 7.5-tonne lorries, all fitted with tail lifts. The right vehicle depends on what you’ve got and where it has to park. Tell us early about:

  • Loading bays, yellow lines or pedestrian zones outside either building.
  • Whether you need to ask the council or the building manager about parking for the day.
  • Low arches, tight turns or narrow lanes on the way in.

A lorry that can’t get close to the door means more carrying, and more carrying means a longer day.

The week before

  • Clear out what you’re not taking. Old chairs, broken printers and boxes of paperwork you’ll never open again. Moving them costs time and money. If there’s a lot, our office clearances service can take it away.
  • Give staff a crate or two and a deadline. Each person packs their own desk and labels it with their name and their new desk number.
  • Pack the paperwork. Filing cabinets are much safer moved empty. Box the files, label the boxes by drawer, and keep anything confidential with someone you trust.
  • Update your address. Your website, Google Business Profile, email signatures, invoices and suppliers all need the new address. Our change of address checklist is written for home moves, but most of it applies to a business too.
  • Tell your customers. A short email and a note on your website saying when you’re moving, and whether phones might be quiet for a few hours, saves a lot of worried calls.

The day before

  • Make sure every box, crate and piece of kit has a label with its new room.
  • Stick a simple floor plan on the door of each room in the new building.
  • Defrost and empty the office fridge.
  • Charge everyone’s laptops and phones.
  • Confirm the time, the keys and the parking with us one last time.

On the day

We arrive when we say we will, and we’ll keep you posted every step of the way. Your move lead walks the crew round once at each end, then lets them get on with it.

The best thing your team can do on the day is stay out of the way, or better still, work from home. A quiet office moves faster. Keep a box of essentials apart from everything else: kettle, mugs, tea, toilet roll, the first-aid kit, a few chargers and the router. That box goes on the van last and comes off first.

If you’d like to read more about how we handle the move itself, our post on office removals in Devon covers it.

The morning after

This is the test. Before your team arrives:

  • Check the internet and phones are working.
  • Check every desk has its screen, its cables and its chair.
  • Test the printer. (Somebody always needs the printer.)
  • Walk round the old building one last time, if you still have the keys, and check nothing has been left in a cupboard.

If all of that’s done by nine, you’re trading again.

Questions people ask

What are the essential things to have for a new office?

The essential things to have for a new office on day one are working internet and phones, a desk and chair for everyone, the printer and a kitchen kit. Everything else can follow. That’s why the IT is at the top of this checklist.

How do I announce my office relocation?

Announce your office relocation by emailing customers and suppliers with the new address and moving date. Then update your website and Google Business Profile, and change your email signatures. If phones may be quiet for part of the day, say so.

What are the disadvantages of relocating?

The main disadvantages of relocating are lost trading time while you move and the risk that the IT or access isn’t ready. Planning around the morning after, as above, is the best way to keep that short.

Get a free quote

Every office is different, so we price each one after we’ve seen what’s moving and where. There are no hidden fees: you get a detailed quote upfront. We can also often take short-notice moves, so it’s worth asking even if your date is close.

Get a free quote or call us on 07792 215204. We aim to reply within an hour.

S

Sigma Removals

Professional removal services across Devon. Helping families and businesses move with care since 2019.

Ready to Move?

Get your free, no-obligation quote today. We're here to make your move stress-free.

Get Free Quote